Oversized, Heavy-Haul & Project Freight

Specialized Freight.
Engineered to the Inch.

Turbines, transformers, dozers, and the loads that break the legal envelope. We classify it, permit it across every state, survey the route, set the escorts, and move it to the foot. The freight that cannot fail, doesn’t.

8′06″Legal Width Line
50-StatePermitting Desk
200k+ lbHeavy-Haul Capacity
1Dedicated Project Manager

Quote Your Specialized Shipment

What Is Specialized

What is specialized freight shipping?

Specialized freight is everything that does not fit a standard trailer or a standard process: over-dimensional and heavy-haul loads that break the legal envelope, high-value and fragile cargo that cannot be treated like a pallet, and multi-piece project freight that has to land in sequence. Think turbines, transformers, excavators, pressure vessels, and manufactured structures.

The work is not the driving, it is the engineering around it. A specialized move is a plan: the right equipment for the load’s height and weight, a permit from every state DOT on the route, a survey of every bridge and wire in the way, pilot cars or police where the width demands them, and a delivery sequenced to the crane schedule. AFX Logistics builds that plan, prices it all-in, and runs it with one project manager from the first measurement to the final set-down.

Specialized is the right call when:

  • The load breaks the legal envelope: over 8′06″ wide, 13′06″ tall, or 80,000 lbs
  • It needs equipment a dry van or flatbed cannot carry, like an RGN or lowboy
  • Permits, pilot cars, or a route survey are part of the move
  • Turbines, transformers, dozers, tanks, and manufactured structures
  • Multi-piece project freight that has to land in sequence, on schedule
The Legal Envelope, Decoded

Is it legal, a permit load, or a superload?

Heavy-haul starts with one question: how far past legal is the load? The federal legal envelope is 8 feet 6 inches wide, about 13 feet 6 inches tall, and 80,000 pounds. Cross any line and you are into permits, escorts, and route surveys, and the further past it goes, the more engineering the move takes.

Enter the width, height, length, and weight. The configurator draws your load inside the legal envelope and returns the classification, the trailer it needs, the permits, and the escorts, before a wheel ever turns.

Interactive Tool

Oversize Load Configurator

Enter the load. See the legal envelope, the equipment, the permits, and the escorts.

13′6″ legal height8′6″ legal width14′0″wide14′0″
PERMIT LOAD
ClassificationPERMIT LOADSingle-trip state permits
EquipmentMulti-axle RGNrecommended trailer
EscortsFront + rear escortsroute survey required
Permit load: over legal at 14′0″ wide, 14′0″ tall, 188,000 lbs. State permits and front + rear escorts, plus a route survey. We engineer and book the whole move.
Get This Load Engineered →

Thresholds reflect common multi-state practice. Every state writes its own oversize rules, so your AFX project manager confirms the exact permits, escorts, and route on your lane.

Heavy-Haul Reference
The lines that trigger a permit
  • Legal width8′06″
  • Legal height13′06″
  • Legal weight80,000 lb
  • 1 pilot carWidth > 12′
  • Front + rearWidth > 14′
  • High-pole carHeight > 14′06″
  • SuperloadWidth > 16′
Equipment Ladder
Low deck for tall and heavy
  • FlatbedClears legal height
  • Step-deckUp to ~10′ tall
  • RGN / lowboyTall or heavy
  • Multi-axleSuperloads
Every state writes its own rules. Widths, heights, and escort triggers change at the state line. We pull permits with each state DOT on the route and survey it end to end before dispatch.
The Failure Points

Three Ways a Heavy-Haul Move Goes Sideways

Oversize loads rarely fail on the open road. They fail at the paperwork, the clearances, and the schedule. We engineer the move around all three.

The Permit That Wasn’t.

A missing or wrong state permit strands a load at a scale house or a state line, burning days and demurrage while the clock runs. We pull permits for every state on the route before the wheels turn, route survey attached, so the load clears every checkpoint it meets.

The Bridge That Didn’t Clear.

An unsurveyed overpass, a low wire, or a turn too tight stops an over-height or over-width load cold, sometimes with no way forward and no way back. We survey the route foot by foot, flag every restriction, and engineer around it before a truck is ever dispatched.

The Sequence That Slipped.

On project freight, one piece arriving out of order idles a crane, a crew, and an install window that costs more by the hour than the freight did. We sequence multi-piece moves to the build plan, so every piece lands in the right order on the right day.

By the Numbers

Built to Scale.
Proven to Deliver.

99%
On-Time Delivery
Measured On Every Load
5,000+
Trucks in Network
Vetted carrier capacity
.01%
Claims Rate
Damage-Free Delivery
350+
Carrier Partners
Across All 50 States
50
States Covered
Plus Canada & Mexico
How It Works

From Measurement to Set-Down in Four Steps

01

Engineer It

Dimensions, weight, and route in. We classify the load, pick the equipment, map every permit and escort, and build the plan and all-in price before anything moves.

02

Permit It

We pull permits with every state DOT on the route, run the route survey for bridges, height, and width, and lock in pilot cars or police where the load requires them.

03

Move It

Specialized equipment is dispatched, the load is secured to engineering standards, escorts take position, and the route is followed to the foot with live tracking.

04

Land It

Delivery is sequenced, single piece or full project, and set on site. One project manager owns the move from the first measurement to the final sign-off.

Choose Your Deck

Flatbed, Step-Deck, RGN, or Multi-Axle?

Heavy-haul is a ladder of deck heights. The lower the deck, the taller and heavier the load it can legally carry.

CriteriaFlatbedStep-DeckRGN / LowboyMulti-Axle
Deck height~5′0″~3′5″~1′06″ to 2′0″Varies by config
Max cargo height~8′06″~10′0″~11′06″ to 12′0″Project-engineered
Typical payloadUp to 48,000 lbsUp to 48,000 lbs40,000 to 80,000 lbs80,000 to 200,000+ lbs
Loads it carriesSteel, pipe, lumber, machineryTaller machinery, tractorsExcavators, dozers, transformersTurbines, beams, superloads
Best whenCargo clears legal heightToo tall for a flatbedTall or heavy, you drive it onBeyond a single RGN’s limits

Not sure which deck your load needs? Run the dimensions through the configurator above, or read our breakdown of flatbed vs step-deck to see where the ladder starts.

Lead Time

How Long Does an Oversize Move Take to Plan?

Transit is the easy part. The lead time lives in the permits, the route survey, and the escorts. The bigger the load, the earlier the conversation starts.

1 to 2 days
Legal load
No permit, ships like flatbed
2 to 4 days
Single-state permit
Oversize in one state
1 to 2 weeks
Multi-state oversize
Permits, escorts, route survey
3 to 6+ weeks
Superload
Engineering, police, utility moves

On a deadline? Bring us in early. The sooner we start permits and the route survey, the more capacity and routing options stay open, and the lower the all-in cost.

Why AFX Logistics

The Load That
Can’t Fail.

A transformer, a turbine, a one-of-a-kind machine: there is no second attempt and no spare on the shelf. We engineer specialized moves so the only outcome is the load, on the pad, on schedule, intact.

Engineer Your Move
01
One PM, Cradle to Pad.
The project manager who engineers your move owns it through permits, escorts, transit, and offload. One person, one plan, one number to call.
02
Permits In-House.
We acquire oversize and overweight permits directly with every state DOT on your route, so approvals are tracked and nothing moves on a pending or wrong permit.
03
The Route, Surveyed.
Bridges, wires, grades, and turns are surveyed and cleared before dispatch. We find the problem on paper, not at a low overpass with a transformer on the deck.
04
Insured to the Value.
High-value and irreplaceable cargo carried under coverage matched to the load, with rigging and load engineering built into the plan.
Coverage

Heavy-Haul Capacity Where You Build

Daily specialized and heavy-haul coverage in all 50 states, with deep capacity in the busiest markets.

Specialized freight by industry

Common Questions

Specialized & Heavy-Haul Freight FAQs

Some Loads Need a Plan, Not Just a Truck.

Tell us the dimensions and the destination. We engineer the rest, permits, escorts, and all.